Posts

Drive By 12-6-25

Image
  Drywall going in!  Garage and workshop drywall walls and ceiling. Drywall going in!  Garage, mechanical room on the left, secondary electrical panel, Stairwell to the second floor. More Drywall, second Workshop More Drywall, Second Workshop, and Workshop bathroom. More Drywall, First Workshop, AC lines to be hidden. Stairwell to the upstairs living space.   Drywall, Future kitchen. More Drywall, Future pantry More Drywall, Future Laundry Room. More Drywall, Ceiling for the Office/2nd bedroom. More Drywall, Closet for Office/2nd Bedroom.  AC piping to be hidden in closet. More Drywall, Office/2nd closet and entryway (looking out).  HVAC unit in the ceiling. More Drywall, Celling for the Master Bedroom. More Drywall, Walk in Closet More Drywall, Bathroom More Drywall, Shower area

Drive By 11-22-25

Image
  Some electrical work and outdoor spigot.  (Main electrical panel to go here) Staining and varnish on the back side of the house. Backside of the house.  Air Conditioning connections, AC to be wall mounted in this location. The stain and varnish on the upper floors have already been done.  Brings out the beauty of the logs. Garage wall insulation, pipe for the outdoor spigot is in the insulation. More wall insulation for the Garage.  City water, Gas and Sewer to be hidden in the wall dividing the garage and workshop. Insulation over the garage, under the living space. More insulation over the garage, under the living space. More insulation over the workshop, under the living space (office / 2nd bedroom).  AC piping to be covered. Insulation for the Great room, with ceiling panels beginning to cover. More insulation for the Great Room.  insulation on both side of the room. More insulation on the great room.  Other side of the room hasn't started t...

Drive By 11/02/25

Image
 Sorry for delay, new computer will not connect to the phone.  Have to do this the slow way. Roof is finally installed! The Trapezoidal windows are now installed too. (upstairs above the door to the balcony) The roof from the other side of the house.  My neighbor Brad, cleaning up his yard. More of the finished roof  

Update from the Builder 9-29-25

Image
 Got an update from the builder yesterday.  looks like he finished a few of the windows with trim.  And started sealing the gaps between the logs. Back of the house.  The builder has erected the scaffolding to work on sealing the back wall of the house. Close up view of the "chinking" in the top corner of the house. Another close up view of the "chinking" Downstair workshop windows are installed with the outside trim. Upstairs window trim is not yet installed. Back side of the house, more of the window trim.

Drive by 9-27-25

Image
 Drove by the property this past weekend.  Took a few pictures      The front Side windows are in.  The Trapezoidal windows are ordered after finial dimension was measured. The back windows are installed, not sure why one window is frosted. View of the future kitchen, from the great room. Downstairs side front window (looking into the Carport area) Sliding glass door, yet to be installed upstairs. The other half of the sliding glass door. (yet to be installed) Workshop #1 Back window, maybe that just a protective cover. Backdoor. Looks like they are half way finished with it.  looks like they had to stop as they ruined a chainsaw blade as the log nail is exposed Workshop #2 back window. Lower Stairwell Window Upper Stairwell Window Great Room, side windows installed, sliding glass door to be installed, waiting for the trapezoidal windows. Side Windows are installed. Office/2nd bedroom windows installed. Master Bedroom windows Cutout for the Laundry roo...