Another Update from the Builder 6-12

Image
 Construction continues!     

Update from the Builder 6-11-25

Image
 Construction progresses!  Update from the builder     

Delivery!

Image
 Logs was delivered today!  Construction now begins!  Hurray!     

New Activity!

Image
 Its Spring Time!  We can start construction again.   Some work is starting to take shape.  I've got a new power pole on my property! They even strung some power lines across the street.  I don't think its connected on the other end.   

The Slab has been Poured

Image
 The slab has been poured just in time for a light dusting on Friday. The city required us to install a temporary drive way for construction vehicles.  So they dumped what was left on the drive way area. Looks terrible, but I will have to demo it out once we are ready for the final driveway. Looks like they vibrated to settle the concrete into the foundations of the pillars for the front porch. but didn't bother to smooth it out with the temporary drive way.      The property will be graded so that the dirt will slop up to the current position of the slab to allow for proper drainage.  The final driveway will be level with the garage entrance once the house is somewhat completed.

Update from the builder!

Image
Just in from the builder. They poured the slab!!! And they sent a picture! I'll head on up tomorrow and take a picture of the final product.