Drive By 11-22-25

 

Some electrical work and outdoor spigot.  (Main electrical panel to go here)





Staining and varnish on the back side of the house.

Backside of the house.  Air Conditioning connections, AC to be wall mounted in this location.

The stain and varnish on the upper floors have already been done.  Brings out the beauty of the logs.


Garage wall insulation, pipe for the outdoor spigot is in the insulation.

More wall insulation for the Garage.  City water, Gas and Sewer to be hidden in the wall dividing the garage and workshop.

Insulation over the garage, under the living space.

More insulation over the garage, under the living space.

More insulation over the workshop, under the living space (office / 2nd bedroom).  AC piping to be covered.

Insulation for the Great room, with ceiling panels beginning to cover.


More insulation for the Great Room.  insulation on both side of the room.


More insulation on the great room.  Other side of the room hasn't started the ceiling panels.


Sliding glass door is in!


 