Drive By 8-9-25
We drove by the property, and dropped off some plumbing items. We walk around admiring the work done so far.
Top of stairs looking towards the front of the house. Temporary support to install the roof joists in way of the stairs.
Great Room, looking towards the kitchen, framing for the bedrooms, bathroom, laundry, and pantry are up. Temporary support for the Center Roof beam, will be removed at some point in the future.
Great Room, looking towards the top landing of the stairs. Temporary support for the pony wall and temporary access for roof joists in the stair well, to be removed at some point during construction.
Admiring the Center Roof Support and structural members.
Hallow wall, originally intended to install Murphy bed in this cubby.
will have to bring up this issues with the builder.
Garage, workshop #1 (left) and Workshop #2 (Right)
Back left corner. Workshop #1 window (Below), Second Bedroom Window (Above)
Carport Roof, structural support for carport not yet installed (on ground, bottom right)
Back left Corner, roof joists details
Future view out the front window,
Great room, looking towards the Kitchen Area
Pantry, Large pantry for all my cooking needs.
Future bathroom, sink and vanity (front), toilet and shower (behind)
Entry to the Master Bedroom















Comments
Post a Comment