Drive By 9-6-25
Drove by and took some more pictures of the house today, take a look!
Roof panels are in waiting for inspection, meanwhile they are framing out the windows.
Workshop window #2
Workshop window #1
Downstairs bathroom window
Workshop #2, Window is framed out and the backdoor is getting trimmed to shape.
Upstairs bathroom window has been trimmed. The flooring protection has been changed due to the recent rain.
Framing for the great room window is starting to take shape. More of the new flooring protection due to recent rain.
windows in the second bedroom have been trimmed.







Comments
Post a Comment