Drive by 9-27-25
Drove by the property this past weekend. Took a few pictures The front Side windows are in. The Trapezoidal windows are ordered after finial dimension was measured. The back windows are installed, not sure why one window is frosted. View of the future kitchen, from the great room. Downstairs side front window (looking into the Carport area) Sliding glass door, yet to be installed upstairs. The other half of the sliding glass door. (yet to be installed) Workshop #1 Back window, maybe that just a protective cover. Backdoor. Looks like they are half way finished with it. looks like they had to stop as they ruined a chainsaw blade as the log nail is exposed Workshop #2 back window. Lower Stairwell Window Upper Stairwell Window Great Room, side windows installed, sliding glass door to be installed, waiting for the trapezoidal windows. Side Windows are installed. Office/2nd bedroom windows installed. Master Bedroom windows Cutout for the Laundry roo...