Drive by 7/19/25

 Drove by the property on Saturday.  Snuck in and took a few pictures of the progress from Thursday.   Warmboard underfloor heating boards came in on Thursday.  Looks like they installed them the same day.


Street View, the garage looks a little dark, did they install the subfloor?

Another street view, oh they got in the stairs!

We snuck into the property, Floor joists are in, stairs are in, and the Mechanical room is framed out.

Oh!  They got the subfloor in.  did they install the Warmboard?

The future Mechanical room. (Hot Water Heats, manifold for the under floor heater, and the fire riser will be placed in here.)

Admiring the craftsman ship of the log walls, also trying to decode the log tags.


More log tags, also the view out the window showing the forklift.

Second floor (living space), Great! they installed the Warmboard Subfloor.  Yippee!

More Second Floor, Future large window for living room

More Second Floor, Second Bedroom/Office.

More Second Floor, Master Bedroom and Main Bathroom.

Back to Garage, admiring the structural support for this large span.  First architect said this couldn't be done. Second Architect said no problem.

Support over the doorway to the garage.

View from the underside of the stairs, would like to install drawers under the steps at some future time.

View from the underside of the stairs (top of stairs)

Future window for downstairs bathroom,  Framing for the Mechanical room not quite finished yet.







 





















 