Builder Update 8-6-25

 Builder made some more progress this past week.  Here is the pictures they sent me.


Garage, Workshop #2, including backdoor, downstairs bathroom & Mechanical Room

Garage, Workshop #1

More of Workshop #2

Mechanical Room, and Stairwell to second floor

Great Room (small window, and new electrical box cutout.)

More electrical cutouts

and more Electrical cut outs

More Electrical Cut outs

Great Room, Larger Windows, roof joist details

More of the Roof Joists


Center log support, bedroom framing mostly done.



Framing for the Pantry, Laundry Room, Second Bedroom.


more framing for the Kitchen area, Master Bath, and Master Bedroom.



 
Roof Joists over Pantry, laundry Room, and Second Bedroom.

More Roof Joists

More Roof Joists, Front Left Corner

More Roof Joists, Great Room, large window and supports.


Current Street View (Carport on the left hand side of the house)

Left Wall, with Carport

Backwall with roof joists.

More of back of the house















Comments

Popular posts from this blog

Drive By 9-6-25

Drive By 8-9-25